Hi all,
what is the difference between the three i.e.
1. UC KERNEL
2. KERNEL
3. KERNEL EXT
Thanks
Jatin Kashyap
Hi all,
what is the difference between the three i.e.
1. UC KERNEL
2. KERNEL
3. KERNEL EXT
Thanks
Jatin Kashyap
Hi all,
What is the difference between the UC KERNEL, KERNEL and KERNEL EXT ?
And where they are used and why?
Thanks
Jatin Kashyap
Hi
At present we are in ECC6.0 ehp4 we need to upgrade to ecc6.0 ehp6.0 can i have steps to do are some prerequisites for the same
Thanks in advance
Hello,
We didupgradeSAPECC6.0EPH3 to EPH6.
After theupgradethe system wasvery slow.
InST04ispossible to verifythe following:
Latch-Wartezeit proAnforderung(ms) über40Millisekunden
TurnoffpagelockingisREPOLOADusingALTER INDEX
TurnoffpagelockingisREPOSRCusingALTER INDEX
Asparsefile existsin master, msdb, tempdborMTP
We have missing dosome procedure?
Can anyone help to detect why the system is very slow.
The Database is SQL SERVER 2008 R2 SP1.
The SAP server have 32GB RAM.
Before the upgrade the system runs well.
Regards,
Tiago
My client is going for upgrade from SAP 4.6C to ECC 6.0, while doing balance carry forward in transaction code 2KET, i am getting an error message that No authorisation for activity 2 in ecc 6.0 Mock 1 system.
Please help.
Regards,
Lakshmi.R
Message was edited by: Jason Lax
dear experts
what is the kernel version in shadow system? is it the same or different than in source system?
i have a system where we run a mock upgrade and notice SVERS has status 702 in shadow and instance wouldn't come up, we thought it was due to kernel incorrect version. source system is on 640 level.
isnt it changed in downtime portion only?
thank you
JK
Hi Experts,
I am planning to do hardware migration with DB upgrade,please suggest.
current system ECC6 SR3 ,Win2003/SQL Server 2005 32 bit
Target System ECC6.0 SR3 win 2012/SQL Server 2012 64 bit
i am planning as system copy method with DB backup/restore method.
Please suggest....
Thanks,
Naresh K
Hi everybody!!!
I have a doubt we are planning to update SAP support package from our SAP ECC 6.0 EnhP5, but we only want to update SAP_HR and EA-HR, my question is: Can I update only those two SP and let the others SP without update? Is this recommended?
This is the current SP Level:
SAP_BASIS | 702 | 10 | SAPKB70210 |
SAP_ABA | 702 | 10 | SAPKA70210 |
PI_BASIS | 702 | 10 | SAPK-70210INPIBASIS |
ST-PI | 2008_1_700 | 7 | SAPKITLRD7 |
SAP_BS_FND | 702 | 8 | SAPK-70208INSAPBSFND |
SAP_BW | 702 | 10 | SAPKW70210 |
SAP_AP | 700 | 25 | SAPKNA7025 |
WEBCUIF | 701 | 7 | SAPK-70107INWEBCUIF |
SAP_APPL | 605 | 7 | SAPKH60507 |
SAP_HR | 604 | 44 | SAPKE60444 |
EA-IPPE | 400 | 20 | SAPKGPID20 |
EA-APPL | 605 | 7 | SAPK-60507INEAAPPL |
EA-DFPS | 600 | 20 | SAPKGPDD20 |
EA-FINSERV | 605 | 8 | SAPK-60508INEAFINSRV |
EA-GLTRADE | 605 | 7 | SAPK-60507INEAGLTRAD |
EA-HR | 605 | 21 | SAPK-60521INEAHR |
EA-PS | 600 | 20 | |
EA-RETAIL | 600 | 20 | |
FINBASIS | 605 | 7 | |
ECC-DIMP | 600 | 20 | |
ERECRUIT | 600 | 20 | |
FI-CA | 600 | 20 | |
FI-CAX | 600 | 20 | |
INSURANCE | 600 | 20 | |
IS-CWM | 600 | 20 | |
IS-H | 600 | 28 | |
IS-M | 600 | 20 | |
IS-OIL | 600 | 20 | |
IS-PS-CA | 600 | 20 | |
IS-UT | 600 | 20 | |
LSOFE | 600 | 20 | |
SEM-BW | 605 | 7 | |
ST-A/PI | 01Q_700 | 0 |
Best regards,
Carlos
Hi all,
I am changing the port icm/server_port_0 in SMICM transaction . But it is in unchangeable mode. How could i change that?
Thanks
Jatin Kashyap
Hi experts,
Can we upgrade 4.7 to ecc6 ehp6 on windows 2012 and Mssql 2012. or we need Windows2008 and Mssql 2008
Thanks & Regards
Anil
Dear All,
We are upgrading from ECC5 to ECC6.
While trying to access Team Calendar as Manager on the upgraded portal, below error is displayed
"There is no team calendar customizing for rule group ATTEND (pers. no. )"
Couple of Information Points:
1. SAP has introduced changes in OADP resulting in new tables in ECC6
2. A standard report RP_OADP_MIGRATE_CUSTOMIZING has been provided to transfer view/view groups from ECC5 to ECC6
3. Using this reported i have been able to resolve team calendar issue for rule groups in cutomer name space (Z*)
4. However, there is a constraint with the report that if view being transferred needs to be renamed in the Customer namespace.
Due to thsi I am not able to trabsfer ATTEND to the upgrade system.
Any pointers/help is appreciated.
TIA.
Hello all,
I'm updating an ERP 6.0 EHP5 system to ERP 6.0 EHP6.
In Mopz, when prompted to select technical usages, there are some that are unselectable (greyed, see attached image) whereas they are currently used in the sys with EHP5 (for instance integration package for SWIFT, Finbasis standalone, ...).
What that this mean exactly?
What are the implications of continuing the update without selecting the components ?
Thanks in advance,
Adam
Hi
At present we are in ECC6.0 ehp4 we need to upgrade to ecc6.0 ehp6.0 can i have steps to do are some prerequisites for the same
Thanks in advance
Hello,
We are in an upgrde process, from ECC6.04 to ECC6.06 SP07.
Testing in DEV enviroment, we found that the standard tcodes FB01, FB60, and posting billing thru VF01, the system dumps:
Syntax error in program "SAPLFWTC "
The current ABAP program "SAPMF05A" had to be terminated because it has
come across a statement that unfortunately cannot be executed.
The following syntax error occurred in program "SAPLFWTC " in include "LFWTCU01
" in
line 312:
"Al parámetro obligatorio "FLT_VAL" no se le han proporcionado datos"
" "
" "
" "
The include has been created and last changed by:
Created by: "SAP "
Last changed by: "SAP "
Error in the ABAP Application Program
The current ABAP program "SAPMF05A" had to be terminated because it has
come across a statement that unfortunately cannot be executed.
We have an OSS message for this issue but at the moment we have response.
Do you have any idea on haw to solved it?
Thanks in advance
Regards
Nazarena
Hi Team,
While performing EHP6 upgrade , pre-processing phase got the below error
CURRENTPHASE MAIN_INIT/JOB_RSVBCHCK2
...started at 20130903100406
# Using phase log file 'PSVBCHCK.LOG'.
...begin processing at 20130903100406
..times self: 0.000000/0.000000 usr/sys, children 0.000000/0.000000 usr/sys.
..finished at 20130903100408 with status SCHEDULED.
...checking parallel status at 20130903100408 for MAIN_INIT/JOB_RS_OLTPSOURCE
# Using phase log file 'PSOLTPSC.LOG'.
..times self: 0.000000/0.000000 usr/sys, children 0.000000/0.000000 usr/sys.
CURRENTPHASE MAIN_INIT/JOB_RS_OLTPSOURCE
...started at 20130903100408
# Using phase log file 'PSOLTPSC.LOG'.
..times self: 0.050000/0.010000 usr/sys, children 0.000000/0.000000 usr/sys.
..finished at 20130903100409 with status SUCCEEDED.
...checking parallel status at 20130903100409 for MAIN_INIT/JOB_RSVBCHCK2
# Using phase log file 'PSVBCHCK.LOG'.
..times self: 0.000000/0.000000 usr/sys, children 0.000000/0.000000 usr/sys.
I have checked , there is no open updates in the system
Can you please do needfull ASAP.
regards,
Balaram
Hi Team,
Please help me on this issue.When I specific the path to DVD mount point for upgrade export and Kernel..I am getting Error : the mount point cannot be accessed.So please any idea
Thanks,
Avinash
Hi,
Please help me on the below Error
ERROR: The mount point cannot be accessed!
Error is shown when I tried to specific paths for Kernel
Thanks,
Avinash
Hi Friends,
I want to install new Ecc6 EHP6 system
when i check for the
Installation master DVD,
SAP Kernal
SAP exports dvd
SAP Java components
Softwares i cant find them all of them in service.sap.com/swdc.Please provide me the exact place where i can get the s/w to install new system. As i know it is enough to have above software to install ehp6. Do we require any other software apart from this. Help me regarding this.please provide me a document if you have any.
Thank you,
Chowdary.