Quantcast
Channel: SCN : All Content - SAP ERP 6.0 Upgrade
Viewing all 870 articles
Browse latest View live

'SPDA_DISASSEMBLE_QUEUE' failed with code 3 key DATASET_WRITE_ERROR

$
0
0

I am getting following error while running SUM , please help , EHP_INCLUSION log is attached too, please help

 

from : SAPup_troubleticket.log

4 ETQ399 Deleting '/usr/sap/SID/SUM/abap/data/RGPFD21.SAP'.

4 ETQ399 Deleting '/usr/sap/SID/SUM/abap/cofiles/KGPFD21.SAP'.

4 ETQ399 Deleting '/usr/sap/SID/SUM/abap/data/R-73602INFINBASIS.SAP'.

4 ETQ399 Deleting '/usr/sap/SID/SUM/abap/cofiles/K-73602INFINBASIS.SAP'.

4 ETQ399 Deleting '/usr/sap/SID/SUM/abap/data/R-60020INECCDIMP.SAP'.

4 ETQ399 Deleting '/usr/sap/SID/SUM/abap/cofiles/K-60020INECCDIMP.SAP'.

4 ETQ399 Deleting '/usr/sap/SID/SUM/abap/data/RB73105.SAP'.

4 ETQ399 ... ERROR in patch queue handling

1EETQ399 Last error code set is 'RFC error system SID nr 00 function 'SPDA_DISASSEMBLE_QUEUE' failed with code 3 key DATASET_WRITE_ERROR: Error when writing to the file /usr/sap/SID/SUM/abap/data/RB73105.SAP.

If you put new packages in the download directory, use option 'init' to upload them'

1EETQ204 Upgrade phase "EHP_INCLUSION" aborted with severe errors ("20130119030858")

sapsidci:sidadm 160> tail -100 SAPup_troubleticket.log

This trouble ticket was created by SAPup on 20130119030858

-------------------------------------------------------------

SAPup broke during phase EHP_INCLUSION in module PREP_EXTENSION / Extension module

Error Message: RFC error system SID nr 00 function 'SPDA_DISASSEMBLE_QUEUE' failed with code 3 key DATASET_WRITE_ERROR: Error when writing to the file /usr/sap/SID/SUM/abap/data/RB73105.SAP.

If you put new packages in the download directory, use option 'init' to upload them

-------------------------------------------------------------

-------------------------------------------------------------

Summary of SAPup:

-------------------------------------------------------------

SAPehpi Release:        lmt_007

SAPehpi Version:        SAPup release lmt_007 version 47.000

Start Release:          731

Target Release:         731

-------------------------------------------------------------

Summary of host system details:

-------------------------------------------------------------

SID:                    SID

Host:                   sapsidci

MS Host:                sapsidci

GW Host:                sapsidci

Start Path:             /usr/sap/SID/DVEBMGS00/exe

Kernel Path:            /usr/sap/SID/DVEBMGS00/exe

-------------------------------------------------------------

Summary of operating system details:

-------------------------------------------------------------

OS Type:                AIX

OS Version:             6.1.0

-------------------------------------------------------------

Summary of database details:

-------------------------------------------------------------

Database Type:          ora

Database Version:       11.2.0.3.0

-------------------------------------------------------------

Summary of RFC details:

-------------------------------------------------------------

Host:                   sapsidci

GW Host:                sapsidci

Client:                 000

Destination:            SID

Language:               E

System No.:             00

-------------------------------------------------------------

-------------------------------------------------------------


Error during MAIN_SHDCRE/SHADOW_IMPORT_UPG1 step

$
0
0

Hi ,

 

I am getting below error during EHP upgrade at MAIN_SHDCRE/SHADOW_IMPORT_UPG1 step in Pre-processing stage.

Error Details:

 

 

 

Checks after phase MAIN_SHDCRE/SHADOW_IMPORT_UPG1 were negative!

Last error code set: Detected 1 aborted activities in 'SHDUPGIMP1.ELG'<br/> Calling '/usr/sap/install/SUM/abap/exe/tp' failed with return code 12, check /usr/sap/install/SUM/abap/log/SAPup.ECO for details

 

 

 

 

 

 

ERROR: Detected the following errors:

# /usr/sap/install/SUM/abap/log/SAPK731MQ03.<- SID ->:

4 ETW000 [ dev trc,00000] SELECT "TRKORR","POS","ATTRIBUTE","REFERENCE" FROM "E070A~" WHERE

"TRKORR"=:A0 AND "POS"=:A1

4 ETW000 20 0.096955

4 ETW000 [ dev trc,00000] stmt_fetch() -> orc=942, 103=DBSL_ERR_DBOBJECT_UNKNOWN 14 0.096969

4 ETW000 [ dbtrtab ,00000] ***LOG BZA=>table E070A~ does not exist on database

4 ETW000 25 0.096994

2EETW000 sap_dext called with msgnr "2":

2EETW000 ---- db call info ----

2EETW000 function: db_rtab

2EETW000 fcode: RT_READ_ONLY

2EETW000 tabname: E070A~

2EETW000 len (char): 88

2EETW000 key: SAPK731MQ03 888888

2EETW000 retcode: 2

 

Any Help will be appreciated.

dbsl patch not upgraded

$
0
0

Hi,


 

We have downloaded the dbsl patch version(318) from marketplace. We

have done the uncar, extracted the files and copied the files to the kernel

location. After restarting the server again, while checking the sm51, the dbsl

patch version in our server is still the same(315).


Please help...


Regards


Praveen

Severe error(s) occurred in phase PREP_INPUT/DBQUERY_PRE! while CRM7 EHP3 upgrade

$
0
0

Hi Experts,

 

we are performing EHP3 upgrade of CRM7.0 system and in the extraction phase, we came across an issue where its not taking password for SYSTEM and SAPSR3 user.

 

C1.JPG

so we tried to check the user status from SQL and the status is open, and we tried to connect to database with SYSTEM & SAPSR3 but we are getting below error.

C2.JPG

please suggest.

the TCM system is recently build with system copy and migrated the database version from 10g to 11g.

 

we have also tried to confirm if the TNS file is correctly configured with below command.

C3.JPG

Please help us in resolving the issue.

MAIN-TRANSEXEC/PARMVNT_TRANS running for long time

$
0
0

Hi Experts,

 

I am upgrading ECC6 EHP 6 ( NW731) from stack 5 to Stack 12 with SUM 1.0 with SP11,

System is on Oracle 11G / AIX 6.1

 

Selected option "single system long downtime no shadow instance or exclusive shadow instance"

 

Now upgrade is in execution phase , and  the step MAIN_TRANSEXEC/PARMVNT_TRANS running for last 15 hours as shown below , SAP app is down , I can see one tp process is running and in /SUM/abap/tmp directory one file PA011015.SID is slowly growing

 

Please let me know if there is any information on this situation

 

MAIN_TRANSEXEC_PARMVNT_TRANS.jpg

EHP7 downtime phase NEWBAS/JOB_RSUPGCUA_PROD problem

$
0
0

Hello,

 

I have some problems with an EHP7 upgrade in downtime phase MAIN_NEWBAS/JOB_RSUPGCUA_PROD. The step comes to no end and in the log file you can only see this:

 

bash-4.1$ cat PSUPGCUA.LOG

1 ETQ201 Entering upgrade-phase "MAIN_NEWBAS/JOB_RSUPGCUA_PROD" ("20141013201000")

2 ETQ367 Connect variables are set for standard instance access

4 ETQ399 System-nr = '01', GwService = 'sapgw01' Client = '000'

4 ETQ399 Environment variables:

4 ETQ399   dbs_db6_schema=sapr3

4 ETQ399   auth_shadow_upgrade=<null>

1 ETQ200 Executing actual phase 'MAIN_NEWBAS/JOB_RSUPGCUA_PROD'.

1 ETQ399 Phase arguments:

2 ETQ399 Arg[0] = 'RSUPGCUAGEN111'

2 ETQ399 Arg[1] = ''

2 ETQ399 Arg[2] = 'NO-IGNORE'

2 ETQ399 Arg[3] = 'RSUPGCUAGEN111\.$(SAPSID)'

2 ETQ399 Arg[4] = '5'

2 ETQ399 Arg[5] = 'CUA GEN'

1 ETQ399 Using error summary log 'PSUPGCUA.ELG'.

1 ETQ399 Expanded phase arguments:

2 ETQ399 Arg[3] = 'RSUPGCUAGEN111\.SBX'

4 ETQ260 Starting batchjob "RSUPGCUAGEN111"

1 ETQ359 RFC Login to: System="SBX", AsHost="sapsbx" Nr="01", GwHost="sapsbx", GwService="sapgw01"

2 ETQ232 RFC Login succeeded

4 ETQ010 Date & Time: 20141013201002

1 ETQ233 Calling function module "SUBST_START_BATCHJOB" by RFC

2 ETQ373 parameter "BATCHHOST" = "sapsbx"

2 ETQ373 parameter "JOBNAME" = "RSUPGCUAGEN111"

2 ETQ373 parameter "REPNAME" = "RSUPGCUAGEN111"

2 ETQ373 parameter "VARNAME" = ""

2 ETQ373 parameter "IV_SCHEDEVER" = " "

2 ETQ373 parameter "BATCHINSTANCE" = ""

 

I can connect to production instance with DDIC user in client 000 and can see in SM50 that the wp´s are waiting for enqueue-server. With ps -ef I cannot find any en.sap-process for the prod-instance. There is only an enqueue-process for the shadow instance!

 

Thank for any helpful answers!

 

Regards, Karlheinz

Alerting - SAPup and EHPI tools

$
0
0

Hi,

 

Can we setup email alerts , such a way that tool can send out a email when the upgrade encountered a error or if it is waiting for a input.

 

Thanks,

Tanuj

ECC 6.0 EHP7 Upgrade Standard BADIs inactive

$
0
0

Hi,

 

We are upgrading the SAP system R/3 4.7 to ECC 6.0 EHP7. and found many BADIs became inactive.

We also have EHP6 system and found total 885 standard BADIs are active where as in new EHP7 system, just 34 BADIs are in active status. The Notes 1898691 and 1969777 are stating that this was fixed with SUM SP9 patch level 6 or above. We used SUM SP10 patch level 8. the Note 1969777 has fix for custom BADIs. But I couldn't find anything to fix the Standard BADIs inactive issue.

 

Please help me if you have any information on this issue.

 

Thank you.


sap CRM EHP3 upgrade PREP_IMPORT/TOOLIMPD phase running long time.

$
0
0

Hi Experts,

 

we have initiated SAP CRM EHP3 upgrade and started the activity and in preparation phase we got a issue with ops$ mechanism which required us to set up the SSFS configuration to connect database Oracle11g with Sap kernel 740.

 

after that the preparation continued and in phase PREP_IMPORT/TOOLIMPI it took long time and we waited for 10hrs and then we have stopped the process and cleaned SUM and restarted SUM tool with fresh dump.

 

again its taking long time in PREP_IMPORT/TOOLIMPD phase.

 

C1.JPG

in the Log folder of SUM not file is getting updated and in temp folder only one file dev_evt is updating with time stamp only not data is being updated in the file.

C2.JPG

Kindly suggest experts.

error in TABIM_TRANS - Inconsistent status for buffer creation

$
0
0

Hi,

 

we are performing EHP4->EHP7 upgrade using latest SUM it is Oracle11.2.0.2 and windows 2008serverR2.

 

 

CURRENTPHASE MAIN_TRANSEXEC/TABIM_TRANS

...started at 20141017091235

..finished at 20141017091235 with status ABORTED.

# Error message set: 'Inconsistent status for buffer creation'

 

I cannot find anything useful to troubleshoot this issue...

 

Any ideas how to fix this?

 

 

 

Regards,

Martin

erp upgrade

$
0
0

Hi,

 

We are upgrading our ECC 5.0 Dev instance to ERP 6.0 EHP5 using SApup tool , during the check phase we are getting the below message.

 

"To perform the manual application-specific pre-upgrade steps,

start ASU Toolbox now. To do this, use transaction /ASU/UPGRADE.

For more information, see SAP Note 1000009.

Continue/ Cancel"

( please find the attached screen shot )

 

Could you please let us know,  how to proceed further?

 

Regards,

Rai

Upgrade step ASU-process post upgrade step

$
0
0

Hi All,

 

To check this message in the right format kindly click on reply first then click on quote original icon ("").

 

I am performing an upgrade from R/3 4.7 to ERP 6.0 SR3, while doing upgrade sapup asking me To perform the manual application specific post upgrade step.

This phase says to run ASU toolbox by using tx /n/asu/upgrade. when i run this tx is show the below list of steps to be performed with showing severity level of some as optional and many as obligatory.

 

Task List                                                                                Severity     SAP R/3 release frm     SAP R/3 release to

IS-OIL Application Test 600                                                 Optional          

KP06xx: Termination SYNTAX_ERROR                                                 Obligatory     470                           500

CGPL: Entries are blank after upgrade                                                Obligatory          

Error handling of task group execution                                Optional          

Mobile device cannot confirm TO after release upgrade     Obligatory     470                         600

Mobile device doesn't find transfer orders after upgrade     Obligatory     470                          600

Grantee Management - Upgrade from EA-PS 2.00 to ECC 600     Obligatory          

Convert customizing for warehouse funds ctr scenarios     Optional          

Various problems classification commitment items (class type     Obligatory          

Unauthorized error messages udring fiscal year change/reassi     Obligatory          

RFFMUDX1 migrates incomplete budgeting tables                          Obligatory          

Non-7bit-ASCII character used for BCS key figures             Obligatory          

Changes in TKEDR for /ISDFPS/RFFMDISTDERIVALE          Obligatory          

BCS - Tool for Deleting Obsolete Derivation Strategies     Obligatory          

BCS Syntax Error on Upgrade from EA-PS 2.00 to ECC 600     Obligatory          

Migration to ERP 6.0 (EA-PS 6.00)                                         Obligatory          

Migration EA-PS 2.00 to ERP 5.0 (EA-PS 5.00)                      Obligatory          

Missing initialization of new fields in table ANLZ                  Obligatory     46C                       470

Activating VMC for the Internet Pricing and Configurator     Obligatory          

Customer specific BSEG-fields not transferred                  Optional          

Conversion of report headers in drilldown-reporting            Optional                                   600

IBase: Upgrade to Release 4.6C and higher                         Optional     46C                         600

ZSAPRCKML_COGS: Upgrade to release 4.7 or higher     Optional     46C                      470

Conversion of CO-Total-Tables                                              Obligatory     46C                      500

Conversion of CO-line-item table COEP                                Obligatory     46C                       600

New General Ledger, problems in CO-documents                 Obligatory                               500

No receivers found in allocations                                          Obligatory     46C                        470

Conversion Of New Process Parameter Long Texts For Search     Optional     110                       600

Migration of process parameters in recipe management     Optional     110                        600

FAQ new depreciation calculation                                        Optional                                600

Upgrading to SAP R/3 47x200 and SAP ECC 500 with RMGMT     Obligatory     100                       500

Reloading Table T512W                                                        Optional          

Converting Short Texts                                                         Obligatory          

Migrating Data                                                                         Optional     4.7     

Activating SAP ECC Extensions                                          Optional          

 

 

I am not sure about which steps I have to perform, I am a bit confused.. because some are optional and some are not relevant to my release (as target or source release is different from mine). and also few things are not applied in my envirnoment hence those steps are also not relevant.

 

Please suggest me, how to proceed and what to do. please guide if i skip this step now and later  on I apply latest SP than still I need to do all this.

 

Regards

Vinay

 

Edited by: Vinay Paul on Sep 11, 2009 10:11 PM

Severe error(s) occurred phase MAIN_SHDIMP/SUBMOD_SHD2_RUN/RUN_RSCPFROM_CRR_UPTIME - Enhancement Package 7 - SAP SUM SP10

$
0
0

Severe error(s) occurred phase MAIN_SHDIMP/SUBMOD_SHD2_RUN/RUN_RSCPFROM_CRR_UPTIME -

Enhancement Package 7 - SAP SUM SP10 -

 

Hello Dear experts,

I am performing an enhancement package 7 using SUM 1.0 SP10 , coming from  SAP ECC 6 EHP6 with Support Package 8, kernel 7.21 ext, Oracle 11.2.0.3, right now I am in step 5.5 Preprocessing - MAIN_SHDIMP/SUBMOD_SHD2_RUN/RUN_RSCPFROM_CRR_UPTIME but there is showing the below error message:

 

 

Severe error(s) occurred phase MAIN_SHDIMP/SUBMOD_SHD2_RUN/RUN_RSCPFROM_CRR_UPTIME -

 

I cannot login to the shadow instance it looks like it were down, but I can see the dispatchers and all the processes running.

I stopped, kill all processes and restarted the server (using the below command) but still nothing:

<update directory>/abap/bin

./SAPup startshd

 

 

Below is the log "SAPup_troubleticket.og" :

 

SAPup broke during phase SUBMOD_SHD2_RUN/RUN_RSCPFROM_CRR_UPTIME in module MAIN_SHDIMP / Shadow Import ehp7

 

 

IMG_17102014_160136.png

 

I appreciate your help,

 

Thank you very much,

 

Best regards,

 

Javier E. Tenorio

SUM SL controller crashes unexpectedly

$
0
0

Dear All,

 

I am facing following error during upgrade:

 

SUM SL controller shutting down unexpectedly and giving java error:

 

"java.lang.NullPointerException: while trying to invoke the method java.net.URL.getPath() of an object returned from com.sap.sdt.server.core.http.HttpManager.getURL(java.io.File)"

 

currently I am at road map step Checks (5.4).

 

Please help to resolve the issue.

 

Thanks

ECC 6 to EHP 6 with DDIC ACTIVATION ERRORS and RETURN CODE

$
0
0

Hi Friends,

 

During Upgradation from ECC6 to EHP 6, its throwing some error, pls help me to rectify this problem.

 

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

DDIC ACTIVATION ERRORS and RETURN CODE in D:\usr\sap\PRD\SUM\abap\log\SAPA-20009INIWBEP.PRD

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

<NO ERROR LINES FOUND, BUT HIGHEST EXIT CODE WAS: "8">

 

 

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

DDIC ACTIVATION ERRORS and RETURN CODE in SAPA702EPU.PRD

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

 

 

  3 EDT014XActivate dependent table "CVERI_CLNT"

  2WEDT192 Enhancement category for table missing

  2WEDT193 Enhancement category for include or subtype missing

  1EEAD696 Generic key field is missing from logical cluster "MANDT""CVERI_CLNT"

  3 EDT015 Dependent table "CVERI_CLNT" was not activated

1EEDO519 "Table" "CVERI_CLNT" could not be activated

 

 

  3 EDT014XActivate dependent table "M_PREMA"

  2WEAD275 Foreign key "M_PREMA"-"BUKRS" (dependency factor "REF" is incorrect here)

  2WEAD275 Foreign key "M_PREMA"-"OBRA" (dependency factor "REF" is incorrect here)

  1EEDT354 Search field "M_PREMA"-"FILIA" not contained in search help attachment

  3 EDT015 Dependent table "M_PREMA" was not activated

  3 EDO525XActivate dependent view "M_PREMA"

  1 EDH202 Check dependent search help "PREMA"

  1 EDH103 Search help "PREMA" is consistent

  3 EMC763 Key field "T7BRAP"-"GRPBR" missing

  2WEMC732 All fields are evaluated as key field

  3 EMC728 View must be deleted from the database and created again

  3 EDO526 View was activated with warnings"M_PREMA"

1EEDO519 "Table" "M_PREMA" could not be activated

 

 

  3 EDT014XActivate dependent table "V_7BR_PREMA"

  2WEAD275 Foreign key "V_7BR_PREMA"-"BUKRS" (dependency factor "REF" is incorrect here)

  2WEAD275 Foreign key "V_7BR_PREMA"-"OBRA" (dependency factor "REF" is incorrect here)

  1EEDT354 Search field "V_7BR_PREMA"-"FILIA" not contained in search help attachment

  3 EDT015 Dependent table "V_7BR_PREMA" was not activated

  3 EDO525XActivate dependent view "V_7BR_PREMA"

  1 EDH202 Check dependent search help "HRPADBRA"

  1 EDH103 Search help "HRPADBRA" is consistent

  3 EMC763 Key field "T7BRAP"-"GRPBR" missing

  2WEMC732 All fields are evaluated as key field

  3 EMC728 View must be deleted from the database and created again

  3 EDO526 View was activated with warnings"V_7BR_PREMA"

1EEDO519 "Table" "V_7BR_PREMA" could not be activated

 

 

  3 EDT014XActivate dependent table "V_T7BRAP"

  1EEDT354 Search field "V_T7BRAP"-"FILIA" not contained in search help attachment

  3 EDT015 Dependent table "V_T7BRAP" was not activated

  3 EDO525XActivate dependent view "V_T7BRAP"

1EEDO519 "Table" "V_T7BRAP" could not be activated

1 ETP111 exit code          : "8"

 

 

 

-Thanks in Advance


SPDD and SPAU transports

$
0
0

Hi Experts ,

 

I am upgrading  ECC 6 EHP6 stack 5 to Stack 12 ,  SPDD and SPAU objects are not same as DEV, QA and Production , we have more objects in DEV compared to QA and production as some of the modifications are still in DEV. Now project team wants to move the all modifications with SPAU and SPDD to QA and PRD.

 

We want to add all SPDD and SPAU objects ( from DEV) with the transports (  one transport for SPDD and one for SPAU )  when SUM prompts for QA and Production ,  Just wondering if it is going to be a problem while adding these transports with QA and Production upgrades.

 

 

Thanks

 

Al Mamun

ABAP DUMP duirng generating query

$
0
0

I have an issue regarding the sap query.We are doing upgrade from ECC5 to 6.0.This problem generates in the new version of TST.

scenario is the client has DEV system and TST system.

After you create a query using transaction SQ01 it goes to custom  transaction code which when excuted calls the sap program which generates sap query.When you execute the custom transaction code in DEV sys it is working fine and  the Program is working fine.

But when you execute SQ01 in TST  and execute it 

it shows an ABAP dump saying the program AZ===*====is not in the library.(which is behind the custom transaction code)

In DEV we generated a query and released to TST but the program is not availabale in TST.Will the query be transported from one server to another.

 

there is one more to tell

When we go to transaction SQ01 and create a query it says correct the ranked list 01 first. this happens in both DEV and TST

do you think this is leading to ABAP dump.

 

Please help in fixing this problem as i am new to sap query

Please it is urgent experts please help.

Upgrade to ERP 6.0 EHP7 SP6

$
0
0

Good afternoon

 

We have our annual patching cycle about to commence and we where hoping to upgrade to ERP 6.0 EHP7 SP6 and also upgrade our SRM 7.0 system to EHP3 SP6 and our CRM 7.0 system to EHP3 SP6 as well. This was released to customer last week, however when I try to generate the xml file via the maintenance optimizer the following message is displayed:-

 

SP Stack 06 (10/2014) # SP Update only, see note 2081050

 

On checking this note it is telling us we cannot upgrade our systems to SP6 but we would have to do a two step process at the moment ie upgrade to SP5 and then patch the systems to SP6 in a second step. This would extend the amount of time the patching would take and increase the downtime of the systems and so is not an easy choice.


The OSS note however says :-


If you would like to run the EHP installation to Suite7i2013 SP06 directly, please wait for the release of the same shortly after RTC of SP06.

 

Does anyone know how long this shortly is likely to be, as we cannot plan or decide what to do with a vague statemnet such as shortly.

 

Thanks for your help

Bill

Severe error(s) occurred in phase PREP_INPUT/DBQUERY_PRE! while CRM7 EHP3 upgrade

$
0
0

Hi Experts,

 

we are performing EHP3 upgrade of CRM7.0 system and in the extraction phase, we came across an issue where its not taking password for SYSTEM and SAPSR3 user.

 

C1.JPG

so we tried to check the user status from SQL and the status is open, and we tried to connect to database with SYSTEM & SAPSR3 but we are getting below error.

C2.JPG

please suggest.

the TCM system is recently build with system copy and migrated the database version from 10g to 11g.

 

we have also tried to confirm if the TNS file is correctly configured with below command.

C3.JPG

Please help us in resolving the issue.

TM_51 is not generating payment amounts in interest rates.

$
0
0

Hello everyone.

 

After upgrading to EHP 7, when we create an instrument of interest rates in TM_51 transaction is not generating the payment of interest rates, only generates the payment of principal.

 

Before the update, this problem did not occur and the generation of the instrument of interest rates occurred without problems.

 

Has anyone experienced this problem?

 

Thank you.

Viewing all 870 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>