I am unable to execute transaction KSU1 as the client is not modifiable.We have upgraded from 4.5B to ECC6 .is there any SAP notes regarding that or is there any alternate way to test the transaction.
Currently, we are running with ERP 6.0 EHP4 and I have provided ST02 (Executed T-code) statistical to SAP, based on that SAP generated a EHP 7 business functions report to me.
After assesment, all the new business functions are not applicable in my environment, as most of the prerequisite features are not met.
As such, are we still recommended to upgrade to EHP7?
In my understanding, during EHP upgrade the new business functions can be activated selectively. Can i upgrade to EHP7 but without activate any new business function?
I believed during EHP upgrade, some SAP components' levels will automatically update to higer level, will this affect the existing function or reports?
I'm installing the Supportpackagestack 10 for ERP6.0 EHP6 on the productive System. In the Extractionphase I get the following error:
The program has found 0 entries in DDXTT and 4835794 in DDXTF. All entries are listed in DDXTTCHK.LOG and DDXTFCHK.LOG. Process the entries in DDXTT and DDXTF now as described in the Troubleshooting and Administration Guide.
I found some posts they advice to clear the Tables in TX SE16. But they had only a few entries in the DDXTT table. To erase an amount of 4835794 entries off the table scaries me.
What can I do to move on with the SPS10 installation? Or does someone know from where I get so much entries? What would happen if I erase all entries off the table?
Currently we are having landscape of : SAP ECC6.0 and Netweaver BI 7.0 EHP1(Dual stack).
Now we are palnning to upgrade our SAP ECC 6.0 to ECC EHP 7. I request you to kindly let me know if any dependecies between ECC EHP7 and SAP Netweaver 7.0 EHP1 (BI)
Recently I have an issue in sap that it is displaying the web page as internet explorer in sap. I have tried so many links to set default browser as firefox but i cannot get proper information about transactions sicf and its services in so many links.
Is there any step-step procedure guide to set the service as firefox instead of internet explorer.
We want to Upgrade our PLM system from NWBC 731 to NWBC 740, for this it is better to have a SANBOX system to upgrade there first the NWBC740 and do some tests. And if everything is in order to Upgrade in the same time the DEV and TEST system?
Has anyone did an upgrade similar case below? Based from our source and target systems, how would my upgrade would be? I would like to know which one I need to upgrade first. There might be dependencies and incompatibilities of which I am not aware of.
Should I upgrade the OS first, then Oracle 9.0 32bit to Oracle 11g 64 bit. Then Non-unicode to Unicode (export), Install ECC 6.0 via SAP Netweaver 7.3 Ehp1.
We're upgrading ERP 5.0 to ERP 6.0 EhP6 and got stuck in phase PREP_EXTENSION/UPLOAD_FIRST. The system throws short dumps DATA_LENGTH_TOO_LARGE / CX_SY_RANGE_OUT_OF_BOUNDS repeatedly:
Runtime Error DATA_LENGTH_TOO_LARGE Except. CX_SY_RANGE_OUT_OF_BOUNDS Date and Time 27.06.2013 19:44:47
ShrtText Invalid partial field access: Length too large
What happened? Error in ABAP application program.
The current ABAP program "SAPLSPDA" had to be terminated because one of the statements could not be executed.
This is probably due to an error in the ABAP program.
...
Information on where terminated The termination occurred in the ABAP program "SAPLSPDA" in "UPLOAD_PARCELS_SDA". The main program was "SAPMSSY1 ".
The termination occurred in line 250 of the source code of the (Include) program "RSPDAF01" of the source code of program "RSPDAF01" (when calling the editor 2500). Processing was terminated because the exception "CX_SY_RANGE_OUT_OF_BOUNDS" occurred in the procedure "UPLOAD_PARCELS_SDA" "(FORM)" but was not handled locally, not declared in the RAISING clause of the procedure. The procedure is in the program "SAPLSPDA ". Its source code starts in line 156 of the (Include) program "RSPDAF01 ".
...
The system is running on AIX 6.1, we upgraded Oracle to 11.2.0.3 beforehand.
Running an SAP upgrade project from 4.6C to ECC 6.0 (EHP6). The customer is running the existing release since the past 8 years with FI/CO, MM,SD,PM and HCM modules.
We are exploring the possibilities and repercussions of moving on to new G/L from the legacy classic G/L. Please have a look at the mentioned points for replies accordingly.
1. As far as I understand, if need to seamlessly transit in the ECC 6.0 with New G/L in a way that the old transactional data, and all balances are retained with historical records, then we need to purchase the SAP New G/L Migration Services, and this would be lead and done by SAP. There is no alternate way of doing it solely by our ownself, Is this correct ?. If we engage SAP for this migration exercise and consulting then does it ensure that all historical data and balances are moved intact in the new G/L environment and from an end user perspective all transactional done to date before moving in ECC 6.0 are retained.
2. I guess we still need to review the integration impact of the new G/L for all other modules, is there a substantial rework to be done or with minimal effort, new account assignments and related configuration can be altered .
3. If we don't opt for SAP G/L Migration service but still want to activate and use the new G/L and profit center accounting, then as far as myself and my team assess, we need to decide a cutover date and gather the balances/open items from the legacy G/L and upload them to the new G/L in ECC 6.0, just as it would be the case for a fresh new implementation for a customer coming from non-SAP environment. If this is correct then :
The customer will lose all historical, detailed transactional data with respect to the legacy G/L and relevant originating entries. In such case for any business reporting requirement, the customer has to keep a separate PRD server alive in a dormant state for fetching the data before the transition in ECC 6.0 environment. Is this the correct understanding and the only possible approach, can there be a better way of ensuring the availability of historical data.
In such a case of doing a cutover data migration from old G/L to new G/L, do we have to upload the rest of the master/transactional data for all other modules as well, enacting a situation that all of them started as fresh new modules in ECC.6.0, or the legacy master / transactional data for all other modules can be kept intact for historical purposes. (examples, all vendors and PO / sales order and customer master / employee master and all payroll historical records for past 8 years).
4. Any indication or official SAP note, that for how long SAP intends to support the legacy G/L in the upcoming ECC versions. It is necessary to know in case the customer currently opts for still continuing with the classic G/L in ECC 6.0 , but we have a lurking danger that SAP would stop the support and availability of legacy classic G/L in the near future. So to a have a long term sustainable benefit, we might deliberate with the customer to take a bitter sip now , and move on to the new G/L with all its bells/whistles and the nuisances it might bring in terms of historical transaction data unavailability.
I hope i was able to make my scenario clearly understandable for having some valuable input from the forum members.