I'm in the process of upgrading our 4.6c QA clustered environment to ECC 6.0 along with a hardware migration (64bit win 2003 and SQL2005) I've sucesfully upgraded our SBX and DEV environment (non-custered) succesfully.
While doing the QA prepare phase, I selected that I did not have a single transport to include because the STSM of my QA environment was pointing to my old 4.6c DEV environment and didn't think I could copy a transport created in the new ECC environment to a 4.6c system.
So I am now at the ACT_700 phase where I must do SPDD. Is there a way that I can use the tranport the development team has created in order to make th SPDD modifications or must they now be done manually again by the DEV team? I would rather not have to have them redo it again.
Can anyone help?