Hi All,
I'm upgrading my ERP system from EhP4 ERP6 NW701 to EhP7 ERP6 NW74.
During the upgrade, at Extraction roadmap, the phase PREP_INIT/JOB_RSUPDTEC takes very long time.
The job was started at 4h ago and still running.
On the previous upgrade [Test System] this phase takes 5 minutos to complete. I really don't understand why this happen.
My Database version is Oracle 11.2.0.3. The OS is HP-UX.
Any ideas about how to solve this issue?
Thanks for advanced.
Regards, Serafim Carvalho