SUM: Error on phase MAIN_POSTP/RUN_RSAIMMERGE_TRANSFER.

Hi all,

 

in order to upgrade/update a SAP instance, I'm facing problem during the phase MAIN_POSTP/RUN_RSAIMMERGE_TRANSFER in postprocessing activities.

 

OS: Windows 2008 Server R2

RAM: 12 GB

Database: Sybase 15.7.0.50
SUM Version: 1 SP9 patch 7

Source SAP instance: ECC6 EHP6 - SAPABA/BASIS -> 731

Target SAP instance: ECC6 EHP7 - SAPABA/BASIS -> 740

 

During the phase MAIN_POSTP/RUN_RSAIMMERGE_TRANSFER, the SUM starts a background job which read sequentially from E071 table, but after 15-20 minutes executing, the job terminated unexpected.

 

SM21 reported:

 

 

Start Workp. 14, Pid 4780
Roll-in of UID/mode 01067/000 failed; RC= -02
TemSe object JOBLGX09442100X67401 was closed remotely

 

 

 

RSAIMTRNS.LOG reported:

 

1 ETQ000 ==================================================

1 ETQ201 Entering upgrade-phase "MAIN_POSTP/RUN_RSAIMMERGE_TRANSFER" ("20140328100945")

2 ETQ367 Connect variables are set for standard instance access

4 ETQ399 System-nr = '00', GwService = 'sapgw00' Client = '000'

4 ETQ399 Environment variables:

4 ETQ399   dbs_syb_schema=SAPSR3

4 ETQ399   auth_shadow_upgrade=<null>

1 ETQ206 Executing pre-phase DB specific actions.

1 ETQ200 Executing actual phase 'MAIN_POSTP/RUN_RSAIMMERGE_TRANSFER'.

1 ETQ399 Phase arguments:

2 ETQ399 Arg[0] = 'RSAIMMERGE_TRANSFER_LST'

2 ETQ399 Arg[1] = 'SAP_AIM_TRNS'

2 ETQ399 Arg[2] = 'NO-IGNORE'

2 ETQ399 Arg[3] = 'TRUPGAIM\.$(SAPSID)'

2 ETQ399 Arg[4] = '20'

2 ETQ399 Arg[5] = ''

1 ETQ399 Using error summary log 'RSAIMTRNS.ELG'.

1 ETQ399 Expanded phase arguments:

2 ETQ399 Arg[3] = 'TRUPGAIM\.DEM'

2 ETQ399 ParControl = 'FINALIZE'

1EETQ399 Last error code set is: Batchjob 'RSAIMMERGE_TRANSFER_LST' with id '09442100' aborted

1EETQ204 Upgrade phase "RUN_RSAIMMERGE_TRANSFER" aborted with severe errors ("20140328100945")

 

 

In the meantime, the RSREGENLOD.LOG reported (which is the next phase to be executed): 

 

1 ETQ201 Entering upgrade-phase "MAIN_POSTP/RUN_RSREGENLOD" ("20140328095322")

2 ETQ367 Connect variables are set for standard instance access

4 ETQ399 System-nr = '00', GwService = 'sapgw00' Client = '000'

4 ETQ399 Environment variables:

4 ETQ399   dbs_syb_schema=SAPSR3

4 ETQ399   auth_shadow_upgrade=<null>

1 ETQ206 Executing pre-phase DB specific actions.

1 ETQ200 Executing actual phase 'MAIN_POSTP/RUN_RSREGENLOD'.

1 ETQ399 Phase arguments:

2 ETQ399 Arg[0] = 'RSGEN_LOAD_SHADOW'

2 ETQ399 Arg[1] = 'SAP_REGENLOD'

2 ETQ399 Arg[2] = 'NO-IGNORE'

2 ETQ399 Arg[3] = 'RSREGENLOD\.$(SAPSID)'

2 ETQ399 Arg[4] = '10'

2 ETQ399 Arg[5] = 'Refill GENSETM'

1 ETQ399 Using error summary log 'RSREGENLOD.ELG'.

1 ETQ399 Expanded phase arguments:

2 ETQ399 Arg[3] = 'RSREGENLOD\.DEM'

2 ETQ399 ParControl = 'FINALIZE'

1 ETQ207 Executing post-phase DB specific actions.

4 ETQ010 Date & Time: 20140328095322 

1 ETQ202 Upgrade phase "RUN_RSREGENLOD" completed sucessfully ("20140328095322")

 

 

The SUM stops as sown in the attached file

 

 

Applyed notes:

1460004

146289

 

 

specifying the following parameters in the profile:

ztta/roll_area = 6500000

ztta/roll_extension = 4000000000

abap/heaplimit = 3000000000

abap/heap_area_dia = 3000000000

abap/heap_area_nondia = 3000000000

abap/heap_area_total = 6000000000

 

 

N.B.
The process igwsd.exe is temporarly not working, I preferred complete the postprocessing phase before fixing it.

 

 

 

 

Please help!!!
Kind Regards
Massimo Solleretto