Hello,
I would like to implement support package stack 24 (10/2013) with SUM on a SAP ECC 6.0 ABAP system, but when I start the SUM tool,
on the bottom of the first screen, in the "Detected SAP NetWeaver system" section the "System Technology" is "Dual Stack system" .
Unfortunately, I don't know anything about the history of the instance, I only noticed that this was a dual stack system in the past,
in the meantime the Java part was incompletely uninstalled and now only the ABAP instance and the Central Services instance
(Message Server + Enqueue Server) are up and running.
My question is, is there a way to make an adjustment in the configuration of SUM to display the correct system technology
(Single Stack ABAP system) without doing the "cleanup" after the incomplete unistallation of the Java part?
Thank you in advance for your help.