Dear Friends,
I am upgrading EHP3 TO EHP6 ,during post processioning phase i am getting below error.
Severe error(s) occured in phase MAIN_SHDIMP/SUBMOD_SHD2_RUN/RUN_RSAIMMERGE_UPG_SHD!
Last error code set: RFC login to system QAS ashost IDMCQAS nr 02 gwhost IDMCQAS gwservice sapgw02 failed with code 8 key RFC_TIMEOUT: Timeout while opening a RFC connection.
I have change memory parameter as per note
1460004 - High memory consumption in upgrade phase RUN_RSAIMMERGE_UPG
Still i am getting same error.
Please do needful.I waiting for your valuable reply.
Thanks a lot in advance.
Regards,
Snehal Patel