ECC upgrade stuck in pre-processing phase
Hi All, Small query on SAP upgrade pre-processing phase. Below are my queries :- 1. DBclone phase in pre-processing got successful2.while trying to perform updatestats in the tables copied by from...
View ArticleSevere error(s) occurred in phase PREP_EXTENSION/CONFLICT_CHECK!
Hi, I am facing below issue in ECC 6.0 EHP7 upgrade in Configuration phase. Please help me to resolve. Current SPAM level is 56 Last error code set: Conflict check failed, return Code = -2,...
View ArticleError in phase: MAIN_SWITCH/SUBMOD_SWITCH_OLDREL/JOB_RDDPURIF_D
Hi Experts,Program "RDDPURI6" not found. During the upgrade in phase MAIN_SWITCH/SUBMOD_SWITCH_OLDREL/JOB_RDDPURIF_D!, i got the following error: "Severe error(s) occurred in phase...
View ArticleSPAM status could not be updated, TABLE_UPDATE_FAILED: CVERS
Hi, We are in process of applying EHP6 for our ECC6.0 system (Win2008R2 Server and Oracle 11.g). The upgrade is currently in the Downtime phase and it is giving an error in phase...
View ArticleMinimum DB2 version requirement for SAP ERP 6.0 EHP 7 SP5 Upgrade
Hello, We are upgrading our ERP system from ERP 6.0 to SAP ERP 6.0 EHP 7 SP5. Our Operating system is AIX 7.1 and Database is DB2 9.7 FP 5. We have generated stack file via MOPZ by selecting...
View ArticleSPAM - status could not be updated, rc 1, reason = "TABLE_UPDATE_FAILED: CVERS
In the downtime phase MAIN_NEWBAS/SUBMOD_UPSTAT/TR_PATCH_STATUS_UPGRADE! i got the error: 4 ETG011 "SAP_BASIS start release:"2EETG011 "Component or current release 740 invalid." When i skip the phase...
View ArticleSUM cannot connect to oracle, SAP runs already with ssfs !?
Hello together, we wanted upgrade ECC 6.0 to EHP 6 on Oracle 11.2.0.4 / Linux. SAP running on ssfs authentication.SAP System starts with ssfs in dev_w7 trace:B ==> connect info for default DB...
View ArticleComponent SP level from XML differs from SP level in source system
Hi all, I'm installing Simple Finance (SAP SFINANCIALS 1.0 add-on) on my ERP system with HANA database. I created a stack xml file using MOPZ on SolMan. I am now running SUM to perform the install...
View Articlesap CRM EHP3 upgrade PREP_IMPORT/TOOLIMPD phase running long time.
Hi Experts, we have initiated SAP CRM EHP3 upgrade and started the activity and in preparation phase we got a issue with ops$ mechanism which required us to set up the SSFS configuration to connect...
View Articlewhile upgrading spam ddl statement is missing
Dear Experts,find the log1 ETP199X######################################1 ETP172 MOVE OF NAMETABS1 ETP101 transport order : "ALL"1 ETP102 system : "DEV"1 ETP108 tp path :...
View Article