Hi Folks,
We are trying to upgrade ERP 6 to ERP EHP6 through SUM.
During START OF PHASE PREP_EXTENSION/CONFLICT_CHECK phase it just hang.
Since 6 hour there is no process moving..or no error is coming...
=========== Tool Configuration ===========
Choose the main configuration of the tool. You can adjust the detailed
settings on the next screen.
01) * Single System (longer downtime, no shadow instance or shadow instance running exclusively)
02) - Standard (standard downtime optimization, moderate resource assignment)
03) - Advanced (extensive downtime optimization, higher complexity, high resource assignment)
: Single System (longer downtime, no shadow instance or shadow instance running exclusively)
Keep archiving on during the whole procedure
01) Yes
Enter a number/range/"all" to change selection or "ok" to end:
Ask some expert options
01) Yes
Enter a number/range/"all" to change selection or "ok" to end:
=========== Parameters for procedure ===========
The tool uses strategy Resource-minimized. Provide further parameters to
configure the procedure. To return to the main configuration screen, choose
Cancel.
Enter the maximum number of background processes during the update:
BATCH PROCESSES (UPTIME): 4
BATCH PROCESSES (DOWNTIME): 3
Enter the maximum number of parallel DDL processes:
DDL PROCESSES (UPTIME): 4
DDL PROCESSES (DOWNTIME): 4
Enter the maximum number of parallel import processes:
R3TRANS PROCESSES (UPTIME): 5
R3TRANS PROCESSES (DOWNTIME): 3
Enter the maximum number of parallel phases to run:
PARALLEL PHASES (UPTIME): 1
PARALLEL PHASES (DOWNTIME): 1
Select the instance of your system that shall be used as background server:
Note: If it is different from the central instance (primary application server
instance) host, F:\usr\sap\ED4\SUM\abap must be mounted on the background
host.
Also note that during the system downtime, all background jobs are started on
your central instance (primary application server instance) while the
background server has to be shut down.
01) * Automated batch job distribution (system will decide where to run the jobs)
02) - cscsapsdc008_ED4_00 ( 3 batchprocesses located)
BatchInstanceInputChoice: Automated batch job distribution (system will decide where to run the jobs)
To limit the memory usage during the activation phase, you can use the
"memory-optimized activator". This will increase the runtime of the phase
ACT_UPG significantly, but enables application of large transport package
queues to your SAP system with limited memory resources. For details, see SAP
Note *1387739* .
Do you want to use this feature?
01) - Yes
02) * No
: No
If you are running dialog instances (additional application server instances),
decide if they should be updated.
Otherwise, they are only stopped and not restarted.
01) Update Dialog Instances
Enter a number/range/"all" to change selection or "ok" to end:
Estimate number of CRR processes to 1
<< 2013/03/07 05:45:15 END OF PHASE PREP_CONFIGURATION/INITSUBST
>> 2013/03/07 05:45:15 START OF PHASE PREP_CONFIGURATION/ASKSWITCHES
Using default decisions for configuration switches in batch mode.
The tool will not merge the start profile into the instance profile.
<< 2013/03/07 05:45:15 END OF PHASE PREP_CONFIGURATION/ASKSWITCHES
>> 2013/03/07 05:45:15 START OF PHASE PREP_CONFIGURATION/DIR_SWITCH_ASK
<< 2013/03/07 05:45:15 END OF PHASE PREP_CONFIGURATION/DIR_SWITCH_ASK
>> 2013/03/07 05:45:15 START OF PHASE PREP_CONFIGURATION/KX_CPYORG_DIAG
<< 2013/03/07 05:45:15 END OF PHASE PREP_CONFIGURATION/KX_CPYORG_DIAG
>> 2013/03/07 05:45:15 START OF PHASE PREP_CONFIGURATION/SCANDIR_KRNLDIAG
<< 2013/03/07 05:45:15 END OF PHASE PREP_CONFIGURATION/SCANDIR_KRNLDIAG
>> 2013/03/07 05:45:15 START OF PHASE PREP_CONFIGURATION/INSTANCELIST_INFO
<< 2013/03/07 05:45:15 END OF PHASE PREP_CONFIGURATION/INSTANCELIST_INFO
>> 2013/03/07 05:45:16 START OF PHASE PREP_CONFIGURATION/RUN_RSUPGSLI
Starting of Configure selective-language-import option in batch (job RSUPGSLI)
working ...
<< 2013/03/07 05:45:47 END OF PHASE PREP_CONFIGURATION/RUN_RSUPGSLI
-- Finished execution of 13/13 phases.
Execution of PREPARE module "Configuration and language selection" ends at 20130307054547
Execution of PREPARE module "Setup control data" begins at 20130307054547
>> 2013/03/07 05:45:47 START OF PHASE PREP_SETUP/SETUPGPAR_PARAMCOMP
<< 2013/03/07 05:45:47 END OF PHASE PREP_SETUP/SETUPGPAR_PARAMCOMP
>> 2013/03/07 05:45:47 START OF PHASE PREP_SETUP/JOB_RDDPURI2
Starting of DDIC-CLEANING in batch (job RDDPURI2)
working ...
<< 2013/03/07 05:45:57 END OF PHASE PREP_SETUP/JOB_RDDPURI2
>> 2013/03/07 05:45:57 START OF PHASE PREP_SETUP/SQLDB_CLEANINDCRE
Running SQL task 'CLEANINDCRE'.
<< 2013/03/07 05:45:58 END OF PHASE PREP_SETUP/SQLDB_CLEANINDCRE
>> 2013/03/07 05:45:58 START OF PHASE PREP_SETUP/UPD_HOSTAGENT
Skip hostagent update. The SAPHOSTAGENT package is not available.
<< 2013/03/07 05:45:58 END OF PHASE PREP_SETUP/UPD_HOSTAGENT
Execution of PREPARE module "Setup control data" ends at 20130307054558
Execution of PREPARE module "Extension module" begins at 20130307054558
>> 2013/03/07 05:45:58 START OF PHASE PREP_EXTENSION/JOB_RSUPGINIT
Starting of INITIALIZE NCVERS/NAVERS in batch (job RSUPGINIT)
working ...
<< 2013/03/07 05:46:03 END OF PHASE PREP_EXTENSION/JOB_RSUPGINIT
>> 2013/03/07 05:46:03 START OF PHASE PREP_EXTENSION/NCVERS_READ
<< 2013/03/07 05:46:04 END OF PHASE PREP_EXTENSION/NCVERS_READ
>> 2013/03/07 05:46:04 START OF PHASE PREP_EXTENSION/UPLOAD_FIRST
Uploading data ...
<< 2013/03/07 05:46:16 END OF PHASE PREP_EXTENSION/UPLOAD_FIRST
>> 2013/03/07 05:46:16 START OF PHASE PREP_EXTENSION/COMPINFO_EXP
<< 2013/03/07 05:46:16 END OF PHASE PREP_EXTENSION/COMPINFO_EXP
>> 2013/03/07 05:46:16 START OF PHASE PREP_EXTENSION/UPLOAD_REQUEST
Uploading data ...
<< 2013/03/07 05:46:26 END OF PHASE PREP_EXTENSION/UPLOAD_REQUEST
>> 2013/03/07 05:46:26 START OF PHASE PREP_EXTENSION/SELSTACKXML_READ
=========== Stack Configuration Overview ===========
According to the selected stack configuration file, the following target state
will be chosen:
Component |Release |SPLevel
=============================
EA-APPL |606 |0006
-----------------------------
EA-DFPS |600 |0022
-----------------------------
EA-FINSERV|600 |0023
-----------------------------
EA-GLTRADE|600 |0022
-----------------------------
EA-HR |600 |0086
-----------------------------
EA-IPPE |400 |0022
-----------------------------
EA-PS |600 |0022
-----------------------------
EA-RETAIL |600 |0022
-----------------------------
ECC-DIMP |606 |0006
-----------------------------
ERECRUIT |600 |0022
-----------------------------
FINBASIS |600 |0022
-----------------------------
LSOFE |600 |0022
-----------------------------
MDG_APPL |606 |0006
-----------------------------
MDG_FND |731 |0006
-----------------------------
PI_BASIS |731 |0006
-----------------------------
SAP_ABA |731 |0006
-----------------------------
SAP_AP |700 |0028
-----------------------------
SAP_APPL |606 |0006
-----------------------------
SAP_BASIS |731 |0006
-----------------------------
SAP_BS_FND|731 |0006
-----------------------------
SAP_BW |731 |0006
-----------------------------
SAP_HR |600 |0086
-----------------------------
SEM-BW |600 |0022
-----------------------------
ST-PI |2008_1_700|0007
-----------------------------
WEBCUIF |731 |0006
-----------------------------
<< 2013/03/07 05:46:26 END OF PHASE PREP_EXTENSION/SELSTACKXML_READ
>> 2013/03/07 05:46:27 START OF PHASE PREP_EXTENSION/NAVERS_READ
<< 2013/03/07 05:46:27 END OF PHASE PREP_EXTENSION/NAVERS_READ
>> 2013/03/07 05:46:27 START OF PHASE PREP_EXTENSION/SQLDB_AVERS_PIBASIS
Running SQL task 'AVERS_PIBASIS'.
<< 2013/03/07 05:46:27 END OF PHASE PREP_EXTENSION/SQLDB_AVERS_PIBASIS
>> 2013/03/07 05:46:27 START OF PHASE PREP_EXTENSION/UPG_TYPE
<< 2013/03/07 05:46:28 END OF PHASE PREP_EXTENSION/UPG_TYPE
>> 2013/03/07 05:46:28 START OF PHASE PREP_EXTENSION/IS_INIT
<< 2013/03/07 05:46:29 END OF PHASE PREP_EXTENSION/IS_INIT
>> 2013/03/07 05:46:29 START OF PHASE PREP_EXTENSION/IS_MOVEMENT
<< 2013/03/07 05:46:29 END OF PHASE PREP_EXTENSION/IS_MOVEMENT
>> 2013/03/07 05:46:29 START OF PHASE PREP_EXTENSION/COMPINFO_ISMV
<< 2013/03/07 05:46:29 END OF PHASE PREP_EXTENSION/COMPINFO_ISMV
>> 2013/03/07 05:46:30 START OF PHASE PREP_EXTENSION/IS_TABDMP_EHP
<< 2013/03/07 05:46:30 END OF PHASE PREP_EXTENSION/IS_TABDMP_EHP
>> 2013/03/07 05:46:30 START OF PHASE PREP_EXTENSION/SCANDIR_EPS
Scanning directory 'F:/usr/sap/trans/EPS/in' - this may take a while...
<< 2013/03/07 05:46:30 END OF PHASE PREP_EXTENSION/SCANDIR_EPS
>> 2013/03/07 05:46:30 START OF PHASE PREP_EXTENSION/EHP_INCLUSION
Uploading data ...
Extracting 11 package(s) ...
(This may take some time)
Extracting 24 package(s) ...
(This may take some time)
Extracting 243 package(s) ...
(This may take some time)
<< 2013/03/07 06:42:25 END OF PHASE PREP_EXTENSION/EHP_INCLUSION
>> 2013/03/07 06:42:25 START OF PHASE PREP_EXTENSION/COMPINFO_EHP
<< 2013/03/07 06:42:26 END OF PHASE PREP_EXTENSION/COMPINFO_EHP
>> 2013/03/07 06:42:26 START OF PHASE PREP_EXTENSION/IS_TABDMP_INC
<< 2013/03/07 06:42:26 END OF PHASE PREP_EXTENSION/IS_TABDMP_INC
>> 2013/03/07 06:42:26 START OF PHASE PREP_EXTENSION/NAVERS2_HANDLE_INIT
<< 2013/03/07 06:42:26 END OF PHASE PREP_EXTENSION/NAVERS2_HANDLE_INIT
>> 2013/03/07 06:42:26 START OF PHASE PREP_EXTENSION/NCVERS2_HANDLE_INIT
<< 2013/03/07 06:42:26 END OF PHASE PREP_EXTENSION/NCVERS2_HANDLE_INIT
>> 2013/03/07 06:42:26 START OF PHASE PREP_EXTENSION/NAVERS2_DELSAINT_C_W
<< 2013/03/07 06:42:26 END OF PHASE PREP_EXTENSION/NAVERS2_DELSAINT_C_W
>> 2013/03/07 06:42:27 START OF PHASE PREP_EXTENSION/NAVERS2_DELSAINT_E_W
<< 2013/03/07 06:42:27 END OF PHASE PREP_EXTENSION/NAVERS2_DELSAINT_E_W
>> 2013/03/07 06:42:27 START OF PHASE PREP_EXTENSION/IS_SELECT
<< 2013/03/07 06:42:27 END OF PHASE PREP_EXTENSION/IS_SELECT
>> 2013/03/07 06:42:27 START OF PHASE PREP_EXTENSION/ADDONKEY_CHK
<< 2013/03/07 06:42:27 END OF PHASE PREP_EXTENSION/ADDONKEY_CHK
>> 2013/03/07 06:42:27 START OF PHASE PREP_EXTENSION/COMPINFO_ADDON
<< 2013/03/07 06:42:27 END OF PHASE PREP_EXTENSION/COMPINFO_ADDON
>> 2013/03/07 06:42:27 START OF PHASE PREP_EXTENSION/ADDON_QCALC
<< 2013/03/07 06:42:49 END OF PHASE PREP_EXTENSION/ADDON_QCALC
>> 2013/03/07 06:42:49 START OF PHASE PREP_EXTENSION/PATCHK_EQUI
<< 2013/03/07 06:42:50 END OF PHASE PREP_EXTENSION/PATCHK_EQUI
>> 2013/03/07 06:42:50 START OF PHASE PREP_EXTENSION/PATCH_CHK3
<< 2013/03/07 06:42:51 END OF PHASE PREP_EXTENSION/PATCH_CHK3
>> 2013/03/07 06:42:51 START OF PHASE PREP_EXTENSION/BIND_PATCH
Uploading data ...
=========== Include Change Request ===========
Enter a Customer Change Request that you want to include into the procedure.
If you do not want to include a Customer Change Request, leave the field
empty.
|Request |Status |
----+---------+--------+
1| | |
2| | |
3| | |
<< 2013/03/07 06:47:55 END OF PHASE PREP_EXTENSION/BIND_PATCH
>> 2013/03/07 06:47:55 START OF PHASE PREP_EXTENSION/COMPINFO_SPP
<< 2013/03/07 06:47:55 END OF PHASE PREP_EXTENSION/COMPINFO_SPP
>> 2013/03/07 06:47:55 START OF PHASE PREP_EXTENSION/ADDON_LANGINC
<< 2013/03/07 06:47:56 END OF PHASE PREP_EXTENSION/ADDON_LANGINC
>> 2013/03/07 06:47:56 START OF PHASE PREP_EXTENSION/CHK_SELDELSAINT
<< 2013/03/07 06:48:05 END OF PHASE PREP_EXTENSION/CHK_SELDELSAINT
>> 2013/03/07 06:48:05 START OF PHASE PREP_EXTENSION/TR_CMDIMPORT_FDTASKS
<< 2013/03/07 06:50:25 END OF PHASE PREP_EXTENSION/TR_CMDIMPORT_FDTASKS
>> 2013/03/07 06:50:25 START OF PHASE PREP_EXTENSION/TR_QUEUE2HEAP
<< 2013/03/07 06:50:36 END OF PHASE PREP_EXTENSION/TR_QUEUE2HEAP
>> 2013/03/07 06:50:36 START OF PHASE PREP_EXTENSION/TR_BUF2HEAP_CUST
<< 2013/03/07 06:50:36 END OF PHASE PREP_EXTENSION/TR_BUF2HEAP_CUST
>> 2013/03/07 06:50:36 START OF PHASE PREP_EXTENSION/IS_TREMPTY
<< 2013/03/07 06:50:36 END OF PHASE PREP_EXTENSION/IS_TREMPTY
>> 2013/03/07 06:50:36 START OF PHASE PREP_EXTENSION/TR_CMDIMPORT_PREPARE
<< 2013/03/07 06:59:57 END OF PHASE PREP_EXTENSION/TR_CMDIMPORT_PREPARE
>> 2013/03/07 06:59:57 START OF PHASE PREP_EXTENSION/JOB_RDDIT020
Starting of ADD ON TASK MERGE in batch (job RDDIT020)
working ...
<< 2013/03/07 07:00:03 END OF PHASE PREP_EXTENSION/JOB_RDDIT020
>> 2013/03/07 07:00:03 START OF PHASE PREP_EXTENSION/IS_SYNC_20
<< 2013/03/07 07:00:03 END OF PHASE PREP_EXTENSION/IS_SYNC_20
>> 2013/03/07 07:00:03 START OF PHASE PREP_EXTENSION/CONFLICT_CHECK
Regards
Mano